Thunder Alley

  • Construction started in February 2007 with G&S Construction as the Prime Contractor

  • Major work included the installation of a 480V/2000A and 208V distribution, bowling lane lighting, black lighting and lamps for “Cosmic” bowling, audio/visual cabling, full kitchen electrical equipment, extensive Lutron lighting control system, and general power/lighting

  • The “Thunder Alley” Bowling Alley Project entailed building a 90,000 sq. ft. state of the art, bowling facility containing 40 bowling lanes, restaurant, pro-shop, entertainment center, and indoor go-kart track valued at over 12 million dollars.