NDOR - HWY 370 Widening

  • Construction started in March of 2011 with Vrana Construction as the Prime Contractor for the NDOR.

  • Major work included the installation of (6) temporary traffic signal intersections, (6) permanent traffic signal intersections with new controllers/cabinets and Batttery backups, (260) in-grade detector loops, (37,000’) 1 1/2” – 2” – 3” trenched/bored conduits with related IMSA signal circuits and street lighting cables, (142) pull boxes, (105) lighting poles, and (2) cantilever sign structures.