United Seeds

  • Construction started in July of 2015

  • Replacement of a 1950’s vintage Frank Adams Main Service Switchboard due to fire caused by arching/sparking of loose and deteriorating connections in fusible branch switches.

  • The difficulties in this Project were finding and installing a new 2-section 800 amp rated Main Service Switchboard with branch fusible switches that would fit back into the existing footprint area and the removal of large rigid steel raceways with large diameter conductors and reworking them to connect back into the new Switchboard. This work had to be accomplished after hours over a weekend.